Analisis Hambatan Operasional Dan Potensi Implementasi Siklus PDCA Dalam Pengendalian Kegagalan Proses Di Rim Line PT Autokorindo Pratama

Authors

  • Achmad Javier Rajendra Universitas Muhammadiyah Gresik
  • Suaibatul Aslamiyah Universitas Muhammadiyah Gresik

DOI:

https://doi.org/10.37888/bjrm.v9i2.1110

Keywords:

Process Failure, Plan–Do–Check–Act (PDCA), Quality Control, Operations Management, Steel Wheel Manufacturing

Abstract

This study aims to analyze the conditions and patterns of product repair processes and examine the potential implementation of the Plan–Do–Check–Act (PDCA) method as a continuous improvement approach in reducing repair frequency at the Rim Line of PT Autokorindo Pratama. This research employs a qualitative approach with a case study design. Data were collected through non-participant observation, semi-structured interviews with key informants across structural positions, and operational document analysis of daily steel wheel production quality reports. Data analysis follows an interactive qualitative model involving data reduction, data display, and conclusion drawing. The results indicate that high repair rates are driven by 5M factors, including human factors (operator precision and manual setting subjectivity), work methods (lack of standardized cleaning procedures), and equipment (wear of clamping moulds and tool sharpness). Implementing the PDCA framework demonstrates significant potential in stabilizing operational quality by enhancing preventive planning, daily shift controls, early problem detection, and standardized work procedures. Sistematic PDCA implementation enables the company to suppress accumulated repair products, improve internal control accuracy, and sustainably optimize operational cost efficiency.

References

Fadli, M. R. (2021). Memahami Desain Metode Penelitian Kualitatif. 21(1), 33–54. https://doi.org/10.21831/hum.v21i1.

Fatah, A., & Al-Faritsy, A. Z. (2021). Peningkatan dan Pengendalian Kualitas Produk dengan Menggunakan Metode PDCA. 3(1), 21–30.

Fatma, N. F., Ponda, H., & Handayani, P. (2020). Penerapan Metode PDCA Dalam Peningkatan Kualitas Pada Product Swift Run Di PT. Panarub Industry. Journal Industrial Manufacturing, 5(1), 34. https://doi.org/10.31000/jim.v5i1.2440

Hadiansah, M. V., & Aslamiyah, S. (2025). Analisis Penurunan Defect Menggunakan Metode Six Sigma pada Perusahaan Pengolahan Plastik Gresik. Jurnal Publikasi Manajemen Informatika Volume, 4.

Heizer, J., Render, B., & Munson, C. (2017). OPERATIONS MANAGEMENT : Sustainability and Supply Chain Management. In Sustainability (Switzerland) (Vol. 12, Nomor 1).

Mekarisce, A. A. (2020). Teknik Pemeriksaan Keabsahan Data pada Penelitian Kualitatif di Bidang Kesehatan Masyarakat. JURNAL ILMIAH KESEHATAN MASYARAKAT : Media Komunikasi Komunitas Kesehatan Masyarakat, 12(3), 145–151. https://doi.org/10.52022/jikm.v12i3.102

Merjani, A., & Kamil, I. (2021). Penerapan Metode Seven Tools Dan PDCA ( Plan Do Check Action ) Untuk Mengurangi Cacat Pengelasan Pipa E-ISSN 2598-9987. 9(1), 124–131.

Nugrowibowo, S., & Rosyidi, M. R. (2023). Pengendalian Kualitas Produk Aluminium Alloy Wheel Dengan Metode Seven Tools dan PDCA. 06(9).

Permadi, R., Mulya, O., Yusuf, A. M., & Trijayadi, M. A. (2025). Implementasi Pendekatan PDCA Dalam Organisasi Manajemen Industri: Sebuah kajian Studi Literatur. Inspirasi Journal of Industrial Management (IJIM), 1(1), 11–18.

Shayet, M. E. N., & Aslamiyah, S. (2025). Optimizing Spare Part Storage Efficiency in the Automotive Sector Using the PDCA Cycle : A Case Study at Manyar Automotive Companies. Jurnal Ekonomi, Bisnis dan Manajemen, 6(1), 165–182.

Sihabbullah, M. R., & Aslamiyah, S. (2025). Analisis Pemilihan Supplier Marmer Dan Granit Menggunakan Metode Analytical Hierarchy Process Pada CV. Unicorn Kencana Indopetra. Jurnal Mahasiswa Manajemen, 5(02), 176. https://doi.org/10.30587/mahasiswamanajemen.v5i02.9414

Downloads

Published

2026-09-28

How to Cite

Rajendra, A. J., & Aslamiyah, S. (2026). Analisis Hambatan Operasional Dan Potensi Implementasi Siklus PDCA Dalam Pengendalian Kegagalan Proses Di Rim Line PT Autokorindo Pratama. BJRM (Bongaya Journal of Research in Management), 9(2), 615–627. https://doi.org/10.37888/bjrm.v9i2.1110